Commercial project · St Ives, Cambridgeshire
SBEM, EPCs and air testing for two commercial units
We brought together site air testing and the as built shell SBEM assessments for two units in St Ives, then issued the final documents after the specification was confirmed.
Discuss your commercial project Email William about this project
- Project scope
- Two unitsCommercial shell stage
- Our work
- Test and assessAir testing, as built shell SBEM and commercial EPCs
- Documents issued
- 20 November 2026Assessments, EPCs and air test certificates
From the site visit to the final documents
We carried out the air testing during the week, then prepared the as built shell SBEM assessments. Once the specification was confirmed, we lodged both commercial EPCs and issued the assessments, EPCs and air test certificates on 20 November 2026.
Keeping the site testing and energy assessment work together helped us coordinate the information needed for this stage of the project.
Agreeing the shell stage scope
For commercial units, the assessment needs to reflect the agreed stage of the building. It is important to establish which building services are installed and which belong to a future fit out.
On this project, confirmation of the specification came before EPC lodgement. Drawings, construction details and site testing all contributed to the information used for the final reports.
Our SBEM service page explains the assessment process and the difference between SBEM calculations, BRUKL reports and commercial EPCs.
Air testing on site

We agree the test requirements and equipment for each building. For a similar project, send the site postcode, drawings and target date when asking about commercial air tightness testing.
Planning the completion stage?
Tell us what has been built, what remains for a future fit out and when you need the documents. We can confirm the assessment and testing scope before providing a fixed quotation.
Request a fixed quotation William Simpsonwilliam@barlingskwa.co.ukKerry Simpsonkerry@barlingskwa.co.uk