Nationwide desktop assessments · Homes and residential developments
What is an overheating assessment?
An overheating assessment examines a home’s risk of excessive indoor temperatures and the design measures needed to manage it. Glazing, orientation, shading, the layout and usable ventilation all affect the result.
Barlings KWA provides simplified-method calculations and CIBSE TM59 dynamic thermal modelling from drawings, with UK-wide enquiries welcome. William and Kerry work directly with homeowners, architects and developers to establish the assessment route and explain the findings.
For England’s Part O requirements we assess the relevant new-residential-building scope. For other locations or planning requests, send the site details and the exact requirement so we can confirm the applicable assessment. See William’s Elmhurst overheating assessor registration.
What’s included in your overheating assessment?
Choose an assessment route
We review your drawings and project details to establish whether simplified calculations or dynamic thermal modelling are appropriate.
Assess the design
We complete the agreed calculations or model, considering the glazing, shading, ventilation and window-opening information.
Understand the findings
A report explaining the method, modelled specification, relevant room results, ventilation and window-opening assumptions, and recommended measures where changes are needed. We confirm the reporting scope for your Building Control or planning submission.
Feedback on the Barlings service
“A fantastic, professional company to work with. Great communication and turnaround time.”Chris Henderson · Barlings KWA client
Nettleham · TM59 modelling
Four rooms assessed with windows closed overnight
The kitchen/dining room, lounge and two bedrooms met the criterion used in the report. The model relied on the specified glazing, daytime window opening and mechanical ventilation strategy.
Read the assumptions and room results →Assessor qualifications
Speak directly to the assessors.
William’s listed Elmhurst scheme memberships include Overheating Assessor. William and Kerry help you establish the assessment route and understand the findings.
View our assessor qualifications →Your project, your quotation
Let’s review your overheating assessment needs.
How much does an overheating assessment cost?
Simplified-method assessment: £180–£250 + VAT. We’ll check whether this assessment route is suitable for your project.
TM59 dynamic thermal modelling: £450–£650 + VAT.
These guide prices cover the overheating assessment only. SAP calculations, EPCs and S7 energy work are quoted separately. We’ll review the size, complexity and scope of your project, confirm the appropriate assessment route and provide a quotation. Tell us if you need several dwellings assessed or want alternative design options modelled.
Tell William and Kerry about the dwelling, its location and the stage of design. We’ll confirm the information needed and quote for the appropriate assessment.
Useful details: site location · drawings · glazing and window-opening details · shading · ventilation · deadline
Request your fixed quote
Start with a few project details. William or Kerry will confirm what we need and the scope of your quotation.
We’ll confirm the scope and fee before work starts. Read our privacy policy.
Technical guidance, project examples & FAQs
The fuller explanations, preparation information and project examples are kept here for you and your designer. Open the guide when you need more detail.
Part O, planning and energy calculations
Which overheating report does your project need?
| Requirement | What to check |
|---|---|
| Part O in England | Approved Document O applies to new residential buildings. It provides simplified and dynamic thermal modelling routes. It is not a blanket requirement for every existing-home extension or conversion. |
| Planning overheating assessment | A planning authority may request overheating evidence separately from Building Regulations. Send the policy, condition or request, including any specified modelling or weather scenarios, so we can quote for the correct scope. |
| SAP energy assessment | SAP evaluates dwelling energy performance. Its outputs do not replace a separate Part O or TM59 overheating assessment where one is required. We can coordinate the services while keeping their purposes and fees clear. |
Read the England Approved Document O and its official frequently asked questions. Requirements differ between UK jurisdictions; we confirm the brief from your project’s location and submission requirements.
Part O and CIBSE TM59
What is a TM59 overheating assessment?
A TM59 assessment uses dynamic thermal modelling to predict overheating risk in a home. It considers how the building’s layout, glazing, shading, occupancy and ventilation affect indoor temperatures under the modelled conditions.
For new residential buildings in England, Approved Document O describes a simplified method and a dynamic thermal modelling route. Where TM59 is used for Part O, the assessment must also apply the requirements set out in Approved Document O. See the official Part O guidance.
We review your project before recommending a route. Window openings need to be considered alongside practical constraints such as security, noise and safe use, so the assessment reflects a ventilation strategy that can be used in practice.
Your assessment is supported by William Simpson, an Elmhurst-accredited overheating assessor.
Two routes, one clear starting point
You don’t need to choose the method alone.
Simplified calculations
A table-based assessment of solar gains and the means of removing excess heat. We review the location, orientation, glazing, shading and usable window-opening areas against the applicable criteria. Suitability depends on the actual design and ventilation arrangements, not simply whether the house looks straightforward.
TM59 dynamic modelling
A dynamic model examines the rooms over time using the applicable weather data and occupancy assumptions, together with the specified fabric, glazing, shading and ventilation. It supports more detailed examination of the design and alternatives. Modelling can identify a need for changes; it does not guarantee that the starting design passes.
Practical design decisions
Explore the measures that suit your home.
Glazing and solar gain
Review glazing areas, solar-control glass and g-values as part of the assessment.
Shading
Consider how external shading can help limit the sunlight entering the building.
Ventilation
Assess window-opening strategies, night-purge ventilation and relevant mechanical ventilation options.
The appropriate measures depend on the project and the assessment results. We explain the assumptions and options so you and your designer can make informed choices.
A straightforward process
From project details to practical recommendations.
Share your design
Send drawings, the site location and available glazing, shading and ventilation details.
Assess the options
We confirm the scope, carry out the agreed assessment and discuss findings that may require design changes.
Receive your report
We provide the results, assumptions and recommended measures for your project team to review.
Project example · Nettleham, Lincolnshire
Overheating assessment for a replacement bungalow.
Barlings carried out a TM59 assessment for a bungalow project in Nettleham, alongside the project’s SAP, EPC and S7 energy work. The overheating assessment examined how the proposed home would perform using DesignBuilder dynamic thermal modelling with the EnergyPlus simulation engine.
Designing for night-time ventilation
The model treated windows as closed overnight. The strategy combined daytime window opening with mechanical ventilation with heat recovery (MVHR), summer bypass and specified bedroom boost ventilation controlled by local switches.
Results linked to the specification
The report recorded passes for the kitchen/dining room, lounge and both bedrooms under the assessment criterion used. These results depended on the glazing, opening arrangements and ventilation settings described in the report.
This project shows why an overheating assessment needs to consider how ventilation will work when occupants are asleep. The report gave the project team a defined strategy to follow, rather than relying on windows being left open overnight.
We can coordinate overheating work with your SAP assessment and EPC requirements. Each service and its fee will be identified in your quotation.
Discuss your home’s overheating assessment →Prepare your overheating enquiry
What do we need for your Part O or TM59 quotation?
Start with the plans and site location. You do not need to have every specification decided before contacting us: we’ll identify the information needed for the assessment and explain any assumptions to agree with your designer.
The building and its location
Send floor plans, elevations, the site postcode and orientation, plus the number of dwellings. Include the project stage and any reporting deadline.
Glazing and shading
Share window sizes, available glazing specifications and opening details. Let us know about overhangs, external shading or nearby obstructions shown on the design.
How ventilation will work
Tell us about proposed ventilation and any limits on opening windows, particularly overnight. Include known noise, security or other practical constraints.
If Building Control or your planning authority has requested a report, send the wording of that request so we can confirm the scope.
Request an overheating assessment quotation →Useful answers before you enquire
Your overheating assessment questions.
Do I need TM59 modelling or simplified calculations?
We can help establish the appropriate route after reviewing your project. Send the drawings and any requirements already raised by your designer or Building Control.
When should overheating be assessed?
Early in the design process is helpful, while there is still scope to consider glazing, shading and ventilation choices.
What information should I send?
Start with the drawings and site location. Glazing specifications, window-opening details, shading and ventilation proposals will also help. We’ll confirm any missing information.
What if the assessment identifies overheating risk?
We discuss practical design measures, such as solar-control glazing, shading or ventilation changes, and explain what further assessment is needed.
Is this the same as a SAP assessment?
No. SAP concerns dwelling energy performance; an overheating assessment considers the risk of excessive indoor temperatures. We can help with both services.
Can you support a planning requirement?
Send us the wording of the planning requirement along with your drawings so we can confirm the assessment scope and reporting needed.
Can I use a TM59 report for both planning and Building Control?
The same model may inform both, but the requested scenarios and reporting requirements can differ. Send both briefs before the assessment starts. A report prepared for one purpose should not be assumed to satisfy the other without checking.
Can windows always be modelled open overnight?
No. The assessment must account for security, noise and safe use, as well as the actual opening arrangements. England’s Part O guidance restricts assumptions for easily accessible openings in relevant circumstances. Tell us about any overnight opening limits. Our Nettleham example shows why the ventilation strategy needs to be defined rather than assuming that windows stay open all night.
How long does an overheating assessment take?
We normally complete assessments within one week of receiving complete project information. Ask if you need a shorter turnaround. We confirm availability and the delivery date with your quotation, including the assessment method, number of dwellings and any additional design scenarios agreed.
An initial guide
Explore your Part O assessment route.
Our free Part O overheating route finder helps you explore the assessment route using your project information. It is a starting point for discussion, not a replacement for an assessment. Send us the drawings and any requirements from your project team so we can confirm the scope.
If you also need energy calculations, see our SAP assessment service.
