Energy calculations for planning submissions

Planning Energy Calculations & S7 Supporting Reports

Send William and Kerry the planning condition or council request alongside your drawings. We agree the calculations needed and explain how the proposed building specification compares with the requested targets.

S7 supporting report
From £150 + VAT
In addition to the agreed SAP fee.
What to send
Planning condition and plans
Include the authority’s exact wording and the proposed specification.
What you receive
Calculations and a report
We confirm the assessment scope with your project team.

What we provide

Clear comparisons and a report of the results.

Review the requirement

We identify the energy targets and comparisons relevant to the calculation work requested by your planning authority.

Calculate improvements

We assess proposed changes to fabric, glazing, building services or renewable energy provision, as appropriate to the project and agreed assessment method.

Explain the evidence

Our supporting report sets out the assessed specification, assumptions, comparisons and results, showing how the calculated performance addresses the agreed requirement.

Our service scope

Our work covers building energy calculations and reports demonstrating their results. Heat-network identification, heat-network feasibility studies and wider energy-strategy work outside the calculations are excluded. Where a planning submission requires these additional elements, your project team will need to arrange them separately.

Central Lincolnshire

Policy S7 calculation support and reports.

For residential projects with Central Lincolnshire S7 requirements, we can provide the calculation evidence and a report explaining how the assessed design achieves the relevant energy targets. This work is agreed alongside the SAP assessment.

The councils publish energy-efficiency guidance, checklists and energy statement templates. We review the requirements relevant to your project so the scope of our calculation report is clear. See the official Central Lincolnshire energy-efficiency guidance and templates.

A calculation report supports your submission. The planning authority decides whether the submitted evidence satisfies the condition.

Project example · Nettleham

Energy assessment support for a replacement bungalow.

Barlings supported the SAP, EPC, overheating and S7 energy work for a replacement bungalow in Nettleham. The project illustrates how planning energy calculations can sit alongside the other assessments needed by the design team.

We agree each service separately so you can see what is included. Read about our SAP work for this project and its overheating assessment.

Anonymised residential planning example

Comparing residential development options.

Barlings prepared SAP-based operational-energy comparisons and an indicative embodied and whole-life carbon appraisal to support a residential planning submission.

The alternatives would provide different floor areas and numbers of homes. The report considered total carbon alongside results per square metre and per dwelling, with the assumptions and assessment boundaries stated.

Energy used during occupation

SAP-based modelling assessed the fabric, building services and solar PV assumptions for the development options.

Carbon over the assessment period

The appraisal combined the operational results with embodied-carbon estimates over a 60-year period, using generic factors and stated project assumptions.

The conversion option had the lower upfront carbon impact, while the replacement home had the lower assessed whole-life total under the stated assumptions. Following submission, the planning officer confirmed that the information addressed the carbon-policy issue raised.

This was an indicative planning-stage options appraisal, not a formally assured RICS whole-life carbon assessment. Carbon comparisons are scoped and quoted separately from standard SAP and S7 supporting reports.

Read the anonymous residential carbon comparison case study →

Guide pricing

S7 supporting report fees.

A report demonstrating how S7 has been achieved starts from £150 + VAT, in addition to the agreed SAP fee.

The final fee depends on the calculation and reporting scope. Send the planning requirement and project information so we can confirm what is needed and provide a quotation.

For the underlying assessment prices, see our SAP calculations and EPC fee guide.

Before you enquire

Information that helps us quote accurately.

  • The complete wording of the planning condition or council request.
  • Site address and planning reference, where available.
  • Plans, elevations and sections.
  • Proposed insulation, glazing, heating, ventilation and renewable-energy details.
  • Existing SAP or SBEM reports and the deadline for your submission.

For requirements outside Central Lincolnshire, send the relevant wording. We’ll confirm whether the requested calculation work is within our scope.

Your project, your quotation

Send us your planning energy requirement.

Tell us what the council has requested and which assessments you already have. William and Kerry will review the information and confirm the calculation and report scope.

Request a Quote
We’ll reply to this address.
A postcode or nearest town is enough to get started.
A few lines are enough: what you’re building, the project stage and any deadline. We’ll confirm which drawings and details we need.

What is 7+4?

Please answer this short question to help prevent spam.